Based
upon results and data obtained from an environmental site assessment, we
can design and implement remediation strategies to deal with various types
of hazardous material cleanup, including:
·
PCB contamination
·
Under or above ground storage tank removal
·
Leached or containerized hazardous material removal.
Eisenbach
& Ruhnke Engineering, P.C.
can calculate and model risk exposure assessments, and develop detailed
engineering reports documenting alternative remediation procedures from
removal to on-site remediation. From initial contract awards to project
close-out, we are able to supervise each and every aspect of the project,
including the proper disposal of hazardous materials. Follow-up sampling
ensures the effectiveness of remediation techniques.
|
|
|
|
|
|
|
Fuel
oil contaminated soil is excavated,
removed from the site and transported to a landfill.
|
|
 |